RU | EN
      1. 3.1.1 Macroeconomic and Industry Review, Market share
      2. 3.1.2 Development Strategy
      3. 3.1.3 Key Performance Indicators
      4. 3.1.4 Key Risks

For the operation of the site, we collect cookies, information about the IP address and location of users. If you do not want this data to be processed, please leave the site.

3.1.3 Key Performance Indicators

The KPIkey performance indicators system is divided into two groups of indicators: key performance indicators and functional key performance indicators. KPIskey performance indicators are indicators, based on Company’s strategic documents used to evaluate the efficiency of Company’s executives (General Director, General Director Deputies, Chief Accountant), FКPIs are individual indicators set for the Company’s officials individually, tailored to the their field of concern. The KPIkey performance indicators and FКPI system is coupled with the variable management’s remuneration (50% for KPIkey performance indicators and 50% for FКPI): each indicator has its own weight in bonuses, annual remunerations are paid, provided that the relevant KPIskey performance indicators are completed. KPIskey performance indicators and FКPIs as well as 2024-2026 targets are set in line with the Charter[7] and Board of Directors’ resolution[8].

Indicator Calculation methodology Weight //Bonus reduction for 2024, % MU Target//threshold value for 2024 2024 actual value* Evaluation of accomplishment in 2024 (%, accomplished/ not accomplished)** Reasons of non-accomplishment 2025 Target *** 2026 Target ***
FINANCIAL AND ECONOMIC KEY PERFORMANCE INDICATORS
ROICreturn on invested capital Operating income, adjusted for PP&E impairment (reversal of impairment), revenues from connection and ECL provision (ECL provision recovery) / sum of average equity and long-term loans and borrowings 10 % 7.1 10.1 120%
accomplished
6.9 8.0
Operating margin Operating income, adjusted for PP&E impairment (reversal of impairment) and revenues from connection / revenues, net of revenues from connection 20 % 8.2 10.2 120%
accomplished
7.4 8.5
Net profit, net of impairment and connection Profit / (loss), adjusted for PP&E impairment (reversal of impairment) and revenues from connection (incl. income tax) 20 RUBruble thous. 7,000,191 8,931,116 120%
accomplished
4,534,887 6,791,423
SPECIFIC INDUSTRY KEY PERFORMANCE INDICATORS
Loss level Electricity losses in the Company’s networks (difference between total supply and net supply and consumption for own needs), multiplied by amount of discrepancies for previous periods, settled against the Company / total supply for the reported period 15 % 6.41 6.26 102%
accomplished
6.24 6.19
Preparedness for winter seasons Indicator evaluating Company’s preparedness to work during winter seasons, based on the Ministry of Energy’s monthly monitoring 20 pcs 1 1 100%
accomplished
1 1
Compliance with the facility launch schedule Total actual fixed assets, commissioned during the reported period, determined by the investment program completion report (in monetary terms, based on the date of signing of the Acceptance Act by the inspection board) / target fixed assets pursuant to the adopted investment program and launch schedule 15 % 93.5 106.8 114%
accomplished
95.0 95.0
BONUS REDUCTION FACTORS  
Maximum limit of discrepancies over losses as of the end of the reported period (year) Bonus reduction factor, calculated as discrepancies as of the end of the reported period (year) (unsettled as of the end of the second month of the year following the reported one) / Company’s electricity losses -10 % 3.50 0.01 accomplished 3.50 3.50
Infringements of transactioning procedures Indicator evaluating absence of violations in procedures related to consummation of large-scale transactions, related-party transactions as well as transactions, subject to approval in line with the Charter -10 number 0 0 accomplished **** 0 0
Timely execution of remedial action plans Indicator, evaluating timeliness of execution of remedial action plans during the reported period by the Company, prepared and adopted after compliance measures, conducted with regard to the Company, and audits and inspections, conducted by the boards of internal auditors -10 % 90 91.7 accomplished One activity in 3Q2024 was completed beyond the deadline (area of responsibility: Deputy General Director for Investments and Capital Construction) 90 90
INDICATIVE FIGURES
Achievement of the National Investment Climate Rating’s factor “Efficiency of connection procedures” Indicator is defined on the basis of the degree of achievement of the benchmarks related to the National Investment Climate Rating’s factor “Efficiency of connection procedures” in regions of the Company’s footprint Indicative figure % 100 95.3 Not accomplished There are 58 RGOsRegional grid operators operating in the regions of the Company’s footprint and impacting the National Investment Climate Rating’s factors, used to calculate the KPIkey performance indicators 100 100

* 2024 value is expected value of KPIskey performance indicators accomplishment, with due regard to the timeline of the reports used for their calculation. Actual values are to be approved by the Board of Directors.
** If KPIkey performance indicators achievement percentage exceeds 120%, one should insert the one equal to 120%; if KPIkey performance indicators achievement percentage is below 80%, one should insert the one equal to 0%.
*** Composition and target values of the indicators are adopted by the Board of Directors[8] and are subject to adjustment (if required) done in line with Board of Directors’ resolution and C-level KPIkey performance indicators and FКPI Calculation Procedure[9].
**** Bonus reduction factor “Infringements of transactioning procedures” should be considered as accomplished in 3Q 2024 in line with the Minutes[10]. Taking into account all reviewed factors, to ensure post-incident inspections and recovery works (in case of power system disturbances) on a section of 110 kV “Emankino-Buskul” aerial power line, the resolution to conclude a contract on compulsory civil liability insurance for vehicle owners between PAOPublic Joint-Stock Company Rosseti Ural and AOJoint-Stock Company SK NOMAD Insurance prior to its approval of the Board of Directors was adopted.

 

Indicator Calculation Methodology Official, liable for FКPI achievement MU 2024 Target Value 2024 Real Value* Evaluation of accomplishment (%, accomplished/ not accomplished)** Reasons of non-accomplishment 2025 Target*** 2026 Target***
FUNCTIONAL KEY PERFORMANCE INDICATORS
EBITDAearnings before interest, taxes, depreciation and amortization Income / (loss) prior to taxation, depreciation and amortization and interest payable, adjusted for PP&E impairment (reversal of impairment) and revenues from connection General Director — 25%;
First Deputy General Director –Chief Operating Officer — 20%;
Deputy General Director for Economics and Finance — 25%
RUBruble thous. 18,923,501 21,506,738 100%
accomplished
18,158,215 20,209,373
Obtainment of certificate for autumn/winter operations Timely obtainment of certificate for autumn/winter operations prior to 05 November of the reported period, pursuant to the Rules on the evaluation of preparedness for autumn/winter operations[11] General Director — 25%;
First Deputy General Director –Chief Operating Officer — 20%
pcs 1 1 100%
accomplished
1 1
Lack of large-scale incidents in the networks, investigated by Rostekhnadzor Calculation of the indicator includes incidents in the Company’s networks classified by a Rostekhnadzor’s commission in line with clause 4 of the Rules for investigation of power sector incidents [12] First Deputy General Director –Chief Operating Officer — 20% Accomp./unaccomp. 0 0 100%
accomplished
0 0
Efficiency of innovative activities Integral indicator of efficiency of innovative activities evaluates the accomplishment of 3 indicators: R&Dresearch and development expenses, procurements of innovative products, quality of development (update) of the IDP / execution of the IDP First Deputy General Director –Chief Operating Officer — 20% % 98.0 98.0 98.0
Increase in labor productivity against 2023 figures Added value on all services / annual average headcount (Comparison to 2023 base figures) Deputy General Director for Economics and Finance — 25%;
Deputy General Director for BP Transformation, Digitization and IT
 — 33%;
Deputy General Director – Head of Office — 33%
% 10.0 39.3 100%
accomplished
15.0 20.0
Active staff turnover Total employees, resigned in line with clauses 3 (termination of a labor contract upon employee’s initiative) and 5 (transfer of an employee upon his request or consent to another employer or transfer to an elected position) of Article 77 of the Russian Labor Code / average headcount as of the reported period Deputy General Director – Head of Office — 33% % 6.5 6.1 100%
accomplished
6.5 6.5
Manning level Staff size, reduction in vacancy rates / Staff size according to the staffing table as of the end of the reported period Deputy General Director – Head of Office — 33% % 95 93 98%
Partially accomplished
Reasons of deviation:
1.Labor-deficient locations (PAOPublic Joint-Stock Company Rosseti Ural’s area of service); 
2. Low unemployment rate; 3.Increase in total turnover rate (+4.2% YoYyear on year in 2024)
95 95
Compliance with connection terms Integral indicator, evaluating the quality of connection, comprising two components: quality of connection request processing, quality of connection contracts execution Deputy General Directors for Investments and Capital Construction -100%;
Deputy General Director for Connection and Development of Additional Services — 50%
Rel.unit 1.1 1.1 100%
accomplished
1.1 1.1
Debt/EBITDA LT+ST loans and borrowings / EBITDAearnings before interest, taxes, depreciation and amortization Deputy General Director for Economics and Finance — 25% RUBruble thous. 1.5 1.2 100%
accomplished
1.8 1.6
Efficiency of the transition to domestic software Calculated as a share of installed Made-in-Russia software in the total volume of installed software of the Company that implements its BoDBoard of Directors-approved schedule on the transition to the preferential use of domestic software Deputy General Director for BP Transformation, Digitization and IT — 33% % 84.3 89.8 100%
accomplished
88.9 90.0
Efficiency of the transition to domestic radio electronics Calculated as a share (percentage) of procurements of Made-in-Russia radio electronics in the total volume of the Company that implements its schedule on the transition to the preferential use of domestic radio electronics First Deputy General Director –Chief Operating Officer — 20% % 77.0 99.6 100%
accomplished
78.0 79.0
Overdue electricity transmission receivables Non-exceedance of actual value of overdue receivables (net of moratorial debt) as of the reported period over the target value Deputy General Directors for Sales — 50%;
Deputy General Director for Legal Affairs and Corporate Governance — 25%;
Deputy General Directors for Security — 50%
RUBruble thous. 2,044,309.3 1,035,949.3 100%
accomplished
826,070.2 855,475.8
Safety of the Company’s assets Calculation of the indicator considers theft or intentional damage of the Company’s property Deputy General Directors for Security — 50% pcs 0 0 100%
accomplished
0 0
Company’s credit rating assigned by a national rating agency Determined by a rating analysis by a Russian rating agency, accredited by the Bank of Russia, with a concluded contract on rating activities General Director — 25%;
Deputy General Director for Economics and Finance — 25%;
Deputy General Directors for Sales — 50%;
Deputy General Director for Legal Affairs and Corporate Governance — 25%
Rating scale Value of the national scale credit rating at or above ruAA+ Value of the national scale credit rating at or above ruAA+ 100%
accomplished
Value of the national scale credit rating at or above ruAA+ Value of the national scale credit rating at or above ruAA+
Enforcement of protection of insider information and maintenance of listing for Company’s shares Integral indicator to evaluate the level of corporate governance, comprised of 2 components: enforcement of protection of insider information and maintenance of listing for Company’s shares Deputy General Director for Legal Affairs and Corporate Governance — 25% Accomp./unaccomp. Accomplished Accomplished 100%
accomplished
Accomplished Accomplished
Timely conduction of AGM by the Company and its subsidiaries The calculation uses violations of statutory terms for the conduct of AGM by the Company and its subsidiaries Deputy General Director for Legal Affairs and Corporate Governance — 25%   100 100 100%
accomplished
100 100
Share of contracts concluded upon conducted electronic tenders Calculated as: amount of electronic tenders ended in conclusion of contracts associated with the spending of funds / total tenders (competitive and non-competitive) ended in conclusion of contracts associated with the spending of funds General Director — 25% % 56.0 85.5 100%
accomplished
60.0 64.0
Number of remarks (mistakes) with regard to the Company’s accounting practices, exposed by the auditor and board of internal auditors in the course of the audits of the reported period Evaluation of the indicator uses remarks (mistakes) with regard to the Company’s accounting and reporting practices, remarks with regard to compliance with the Russian laws on taxes and levies as well as materiality level, set by the audit standards. Chief Accountant – Head of Accounting and Tax Reporting Department — 100% Accomp./unaccomp. 0 0 100%
accomplished
0 0
Efficiency of sales of additional services The indicator evaluates the achievement of target value of revenues from additional services and achievement of target value of gross profit from additional services as of the reported period Deputy General Director for Connection and Development of Additional Services — 50% % 100 133 100%
accomplished
100 100
Execution of the information security plan The indicator evaluates the execution of the information security plan under execution of the Digital Transformation Program, adopted by the Board of Directors, Decree[13] Deputy General Director for BP Transformation, Digitization and IT — 33% % 95.0 105.7 100%
accomplished
95.0 95.0

* 2024 value is expected value of FКPIs accomplishment, with due regard to the timeline of the reports used for their calculation. Actual values are to be approved by the Board of Directors.
** If FКPI achievement percentage exceeds 100%, one should insert the one equal to 100%; if FКPI achievement percentage is below 90%, one should insert the one equal to 0%.
*** Composition and target values of the indicators are adopted by the Board of Directors[8] and are subject to adjustment (if required) done in line with Board of Directors’ resolution and C-level KPIkey performance indicators and FКPI Calculation Procedure[9].